About
Every picture and every figure comes from somewhere. Here is where.
The project
- Khonsu shows the real Moon as it is today, drawn from NASA data.
- It maps everything named on the Moon, follows every mission, and gathers what we know about it.
- It is open and non-commercial: no ads, nothing to sell.
- Every fact on the site comes with its source, listed below.
Sources
Grouped by what they give the site.
The Moon’s surface
- CGI Moon Kit (SVS 4720) NASA Scientific Visualization Studio
The colour and the relief of the Moon on every page: LROC WAC colour mosaic and LOLA laser altimetry, recalibrated to the real maria/highlands contrast.
- Lunar Reconnaissance Orbiter (LRO) NASA Goddard Space Flight Center · Arizona State University (LROC) · LOLA Science Team
The spacecraft whose cameras (LROC) and laser altimeter (LOLA) measured the data above.
Positions and phases
- Astronomy Engine Don Cross
Where the Moon and the Sun are, the phase, the libration and the Moon’s orientation (IAU rotation model), for any date.
- Dial-A-Moon NASA Scientific Visualization Studio
The reference our calculations are tested against (JPL DE421 ephemeris): Khonsu agrees within 0.005° on the Moon’s orientation.
Names on the Moon
- Gazetteer of Planetary Nomenclature International Astronomical Union Working Group for Planetary System Nomenclature (WGPSN) · USGS Astrogeology Science Center
Every official name on the Moon: where it is, its size, its type, when it was approved and where the name comes from.
- LROC Anthropogenic Objects LROC Science Operations Center, Arizona State University (NASA LRO)
Where the landers, rovers, experiments and impact sites left by missions lie, measured on LROC images and by laser ranging; mission and landing date.
- Coordinates of anthropogenic features on the Moon R. V. Wagner, D. M. Nelson, J. B. Plescia, M. S. Robinson, E. J. Speyerer, E. Mazarico — Icarus 283:92-103 (2017)
The method and the reference behind the positions of man-made objects; citation required by the LROC dataset.
- Wikidata Wikidata contributors · Wikimedia Foundation
The French names of lunar features, and the links to their Wikipedia articles.
- NSSDCA Master Catalog and lunar mission pages NASA Space Science Data Coordinated Archive (Goddard Space Flight Center)
The landing dates of Surveyor 1 and of the Luna landers, where another list gives their launch date by mistake.
Missions: archives and references
- Beyond Earth: A Chronicle of Deep Space Exploration, 1958–2016 (NASA SP-2018-4041) Asif A. Siddiqi — NASA History Division
Launch date and time (UT) and outcome of every robotic Moon mission from 1958 to 2016 (Table 1, outcome codes S / P / F / IP), and whether a failure was the launch vehicle's or the spacecraft's (entry narratives).
- Chronology of Lunar and Planetary Exploration NASA Space Science Data Coordinated Archive (Goddard Space Flight Center)
Launch dates of the Moon missions after 2016 whose NSSDCA catalogue page does not open (tools/import_missions.py).
- Table of Anthropogenic Impacts and Spacecraft on the Moon NASA Space Science Data Coordinated Archive (Goddard Space Flight Center)
Date and kind (soft landing or impact) of every arrival on the Moon, and the approximate site where LROC has not measured one; the outcome of the landers launched after 2016.
- Commercial Lunar Payload Services (CLPS) Deliveries NASA Science Mission Directorate
Launch dates of Peregrine Mission One and IM-1, and whether they landed.
- CAPSTONE NASA
CAPSTONE completed its primary technology objectives; NASA’s activities ended in June 2026.
- Artemis I NASA
Outcome and splashdown date of the uncrewed Artemis I flight test.
- Artemis II NASA
Launch date of Artemis II (1 April 2026).
-
Outcome of Artemis II and its splashdown time (5:07 p.m. PDT on 10 April 2026, i.e. 00:07 UTC on 11 April).
- Lunar Trailblazer NASA
Lunar Trailblazer lost contact the day after launch; NASA ended the mission on 31 July 2025.
-
LRO is an active mission, in lunar orbit since 2009.
-
Two THEMIS spacecraft were sent into lunar orbit as ARTEMIS and still work there.
- Opening of International Loan Applications for Chang’E-5 Lunar Research Samples (2025) China National Space Administration
Chang’e 5 brought lunar samples back to Earth (CNSA lends them to researchers).
- Study on Chang'e-6 samples sheds new light on lunar oxidation mechanism (16 Nov 2025) China National Space Administration (Xinhua)
Chang’e 6 brought far-side samples back to Earth.
Missions: operators’ announcements
-
Moon Base I, II and III (Blue Moon MK1, Griffin-1, IM-3) and MoonFall: targets and launch windows as of May 2026.
- Moon Base Phases NASA
Phase One missions of the Moon Base (Griffin-1, IM-3, VIPER, CAPSTONE 02, Blue Ghost Mission 2, MoonFall): payloads and target years (page updated 24 Aug 2026).
- NASA Launch Schedule NASA
NASA’s own list of upcoming lunar launches and their stated dates (checked 4 Oct 2026).
-
Launch date (January 2027) and landing site (Shackleton Connecting Ridge) of Blue Moon MK1; page updated 22 Sep 2026.
-
Launch year (2026) and landing site (Nobile crater) of Griffin-1; page updated 1 Sep 2026.
-
Launch year (2026) and payloads of IM-3; page updated 1 Sep 2026.
-
NASA’s stated launch year for Blue Ghost Mission 2 (still 2026 on 1 Sep 2026, against Firefly’s “no earlier than 2027”).
-
Launch year (2027) and landing site (Mons Mouton) of IM-4; page updated 22 Sep 2026.
-
CLPS task-order numbers and the launch windows NASA gave in February 2025 (an outdated page, used only as a dated record).
-
Task order CS-7: VIPER to land in late 2027 on a second Blue Moon MK1 lander, delivery being a contract option.
-
Four CLPS landings ordered for late 2028 (two Astrobotic, one Firefly, one Intuitive Machines).
-
Artemis III becomes a low Earth orbit test in mid-2027; first landing on Artemis IV in early 2028; Artemis V by late 2028.
-
NASA “intends to pause Gateway in its current form”; Moon Base in phases; up to 30 robotic landings from 2027.
- Artemis IV NASA
Artemis IV launch target (early 2028) and its South Pole landing profile.
- Gateway NASA
Gateway partners; the page still read “No earlier than 2027” on 4 Oct 2026, despite the pause announced on 24 Mar 2026.
-
Griffin-1 carries the FLIP rover to the Nobile region; delivery then scheduled for the end of 2025.
-
Griffin-1 launch targeted for late 2026.
-
Peregrine-2 and Peregrine-3: both to launch in 2028 to a site near the Gruithuisen Domes.
- Blue Ghost Mission 2 Firefly Aerospace
Launch no earlier than 2027, landing near Nassau crater on the far side, payloads (LuSEE-Night, Lunar Pathfinder, UAE rover).
- Blue Ghost Mission 3 Firefly Aerospace
Launch no earlier than 2028 to the Gruithuisen Gamma dome, with a rover and the Elytra Dark orbiter.
- Firefly Awarded $177 Million NASA Contract for Mission to the Moon’s South Pole (29 Jul 2025) Firefly Aerospace
Blue Ghost Mission 4 to the south pole in 2029; also gives the 2026 date then planned for Mission 2.
- ispace Announces New “ULTRA” Lunar Lander Integrating Japanese and U.S. Lander Models (27 Mar 2026) ispace, inc.
ispace renumbers its missions: Mission 2.5 (as early as 2027), Mission 3 (2028), Mission 4 (2029), Mission 5 (2030).
- Argo Space and ispace-U.S. Finalize Contract for Lunar Satellite Delivery “Mission 2.5” (17 Sep 2026) ispace technologies U.S.
Mission 2.5: relay satellite carried to lunar orbit by Argo’s Argonaut, launch as early as 2027.
- ispace and Mitsubishi Heavy Industries Agree to Launch Mission 3 ULTRA Lunar Lander Aboard H3 Rocket (29 Jul 2026) ispace, inc. · Mitsubishi Heavy Industries
Mission 3 to launch on an H3 rocket, scheduled for 2028.
- ispace Announces Q1 Financial Results for the Fiscal Year Ending March 2027 (7 Aug 2026) ispace, inc.
Latest ispace schedule: Mission 2.5 as early as 2027, Mission 3 in 2028, Mission 4 in 2029.
- ESA and ispace-EUROPE Mark Official Signing of Europe’s First Lunar Polar Ice Exploration Rover Mission (2 Sep 2026) ispace-EUROPE · ESA
ESA’s MAGPIE rover to launch in 2029 on ispace Mission 4, near the lunar south pole.
- 嫦娥七号飞行任务器箭组合体完成垂直转运 (19 Aug 2026) China Manned Space Agency (CMSA)
Chang’e-7 and its Long March 5 rolled out to the pad, launch planned within days.
- 嫦娥七号任务不满足发射条件 不能在今年预定窗口实施 (23 Aug 2026) China Manned Space Agency (CMSA)
Official notice: Chang’e-7 does not meet launch conditions and cannot launch in this year’s planned window.
-
English wire report of the CMSA notice postponing Chang’e-7.
- Due to need for “absolute success,” China delays critical Moon launch to 2027 (23 Aug 2026) Eric Berger, Ars Technica
Specialised press: Chang’e-7 now expected in 2027 (no official date); also reports the loss of a New Glenn and its pad in May 2026, which delays Blue Moon MK1.
- What’s Happening in Space Policy August 23-30, 2026 SpacePolicyOnline.com
Chang’e-7 was to launch on 23 Aug 2026; the lunar window then open ran through 31 August.
- China’s Chang’e-7 moon mission to target Shackleton crater (30 Jan 2024) Andrew Jones, SpaceNews
Chang’e-7 landing target: the illuminated rim of Shackleton crater.
- Announcement of Opportunities for International Cooperation of the Chang’E-8 Mission (2 Oct 2023) China National Space Administration (CNSA)
Chang’e-8: launch “around 2028”, lander, rover and robot for the lunar south-pole region.
- 工程简介 (China Manned Space Program overview) China Manned Space Agency (CMSA)
Official goal: the first Chinese crewed landing on the Moon before 2030.
-
Long March 10 low-altitude test and Mengzhou max-Q abort test at Wenchang on 11 Feb 2026.
- ISRO Annual Report 2025-26 Indian Space Research Organisation (ISRO), Department of Space
Chandrayaan-4 approved “by 2027” (p. 192); Chandrayaan-5/LUPEX sanctioned on 10 Mar 2025 (p. 83), with an ISRO landing engine tested for it (p. 105).
-
Specialised press: Chandrayaan-4 targeted for October 2027, on two LVM3 launches.
- Lunar Polar Exploration Mission (LUPEX) JAXA Space Exploration Center
LUPEX: launch no earlier than 2028 on an H3 rocket, landing in the south pole region.
- Russia resets lunar programme (4 Feb 2026) Nuclear Engineering International
NPO Lavochkin’s director general: Luna-26 in 2028, Luna-27A (south pole) in 2029, Luna-27B (north pole) in 2030.
- Russia Delays Moon and Venus Missions Again (22 Aug 2025) The Moscow Times
Luna-26 pushed from 2027 to 2028 (Russian Academy of Sciences); Luna-27 had been planned for 2028.
Library: science
- OpenAlex OurResearch
The metadata of every article on the Science shelf: exact title, authors, journal, year, open-access status and licence; abstracts only when their licence allows it.
- Crossref REST API Crossref
A check of each article’s DOI, title, authors and licence, against OpenAlex.
- arXiv Cornell University
The abstracts of articles that have an arXiv version, shown under arXiv’s CC0 metadata licence.
- Tides and Water Levels (tutorial) NOAA National Ocean Service
Why the Moon raises two tidal bulges, the Sun’s share (about half the Moon’s) and spring tides.
Library: photographs
-
Photographs of the Moon on the Photos shelf (Apollo, Lunar Orbiter, Artemis II, LRO): image links, date and credit, read by tools/import_photos.py.
-
The rules we follow for NASA photos: generally not under copyright in the US, no endorsement implied, no insignia, no third-party content.
- Wikimedia Commons Wikimedia Foundation and its contributors
Photographs of the Moon taken from Earth and some mission frames, each under its own free licence (public domain, CC0, CC BY or CC BY-SA), credited on its page.
Library: history
- The Ancient Egyptian Pyramid Texts James P. Allen · SBL Press (Writings from the Ancient World)
The History shelf’s Khonsu story: the date of King Unis, his “Cannibal Hymn” (Spell 180, PT 273–274) and the glossary entry linking the crescent Moon to the god Khonsu.
- Ancient Records of Egypt, vols. III and IV (1906) James Henry Breasted · University of Chicago Press
The History shelf’s Khonsu story: the Bentresh stela (vol. III, §§429–447) and its late date, the Theban triad Amun, Mut and Khonsu, and Ramesses III’s temple of Khonsu (vol. IV).
- Khonsu pendant (65.194.1) The Metropolitan Museum of Art, New York
A gold pendant of Khonsu, New Kingdom (ca. 1300–1080 BCE): proof that people wore the Moon god, in the Khonsu story.
- Khonsu amulet (23.10.25) The Metropolitan Museum of Art, New York
A Late Period amulet of Khonsu (664–380 BCE), in the Khonsu story.
- Travels through the Interior Parts of North-America, in the Years 1766, 1767, and 1768 (London, 1778) Jonathan Carver · digitised by the University of Pittsburgh Library and the Internet Archive
One of the oldest printed lists of lunar month names in North America (chapter IV, pp. 250–252), in the story of the full-moon names.
- Full Moon Names The Old Farmer’s Almanac
What the almanac says of its own list of moon names (sources, a name for a whole lunar month, the Wolf Moon’s English origin, its definition of the Harvest Moon).
- Full Moon Names Farmers’ Almanac (Lewiston, Maine)
The almanac’s own account of where the names come from, and its statement that almanacs have printed them since the 1930s.
- Introduction to Calendars U.S. Naval Observatory, Astronomical Applications Department
Solar, lunar and lunisolar calendars, the 19-year Metonic cycle (235 lunar months), the Islamic and Hebrew calendars, in the story of lunar calendars.
- The Date of Easter U.S. Naval Observatory, Astronomical Applications Department
The ecclesiastical rules of Easter (Nicaea, tables, 21 March, ecclesiastical full moon, 22 March–25 April), in the story of lunar calendars.
- Rules for the Chinese Calendar Yuk Tung Liu
The rules of the modern Chinese calendar (new moon, winter solstice in month 11, leap month without a major solar term, 1645 reform) and the mean lengths of the month and the year.
- Calendar, History of — The Jewish Encyclopedia (1906) Funk & Wagnalls · JewishEncyclopedia.com
Hillel II’s publication of the calendar rules (359 CE by later tradition) and the doubled month of Adar in leap years.
- The Face of the Moon: Galileo to Apollo Linda Hall Library (William B. Ashworth Jr.)
Galileo’s first drawings and the Sidereus Nuncius, Hevelius’s Selenographia and the Riccioli–Grimaldi map of 1651, in the story of the first Moon maps.
- Scientist of the Day — Thomas Harriot Linda Hall Library (William B. Ashworth Jr.)
Harriot’s telescopic sketch of the Moon on 26 July 1609, and his unpublished map.
- The Galileo Project — The Moon Albert Van Helden · Rice University
Harriot and Galileo, the longitude problem behind the first maps, Van Langren’s map of 1645 and Hevelius’s Selenographia of 1647.
- The Galileo Project — Langren, Michael Florent van Richard S. Westfall · Rice University
Van Langren, royal cosmographer to the King of Spain, and the patrons he named on his Moon map.
- The Apollo Program (1963–1972) NASA Space Science Data Coordinated Archive (David R. Williams)
Every Apollo flight to the Moon with its dates and landing site, Apollo 1 and Apollo 13, and the surface experiments, in the Apollo story.
- The Apollo Program NASA
The twelve astronauts who walked on the Moon and their roles, in the Apollo story.
- Lunar Rocks and Soils from Apollo Missions NASA Astromaterials Acquisition and Curation Office (Johnson Space Center)
The Apollo samples: 382 kg, about 2,200 samples from six sites, still lent to researchers, and what they taught us.
Missions: follow-up sources
- Surprise Chinese lunar mission hit by launch anomaly (14 Mar 2024) SpaceNews (Andrew Jones)
Launch of DRO-A/B on 13 March 2024 (12:51 UTC) and Xinhua’s report of the upper stage anomaly.
- Chinese spacecraft appear to reach lunar orbit despite launch setback (20 Aug 2024) SpaceNews (Andrew Jones)
DRO-A and DRO-B reached their distant retrograde orbit around the Moon (CAS slide).
- China Saves DRO Moon Mission (18 Feb 2025) IEEE Spectrum (Andrew Jones)
The 167-day rescue of DRO-A/B and their tests in distant retrograde orbit.
-
Tiandu-1 and -2, Deep Space Exploration Laboratory test satellites to fly in lunar orbit with Queqiao-2.
- 鹊桥二号中继星成功发射 (20 Mar 2024) Xinhua
Launch of Long March 8 Y3 with Queqiao-2 on 20 March 2024 at 8:31 Beijing time.
- 鹊桥二号中继星顺利进入环月轨道 (25 Mar 2024) Xinhua (CNSA)
Lunar orbit insertion of Queqiao-2 and of Tiandu-1 and -2, carried by the same rocket.
- Chinese satellite snags new views of Earth from lunar orbit (14 Jun 2018) The Planetary Society
Longjiang-1 did not reach lunar orbit; Longjiang-2 did.
- Lunar Orbiter Longjiang-2 Smashes into Moon (5 Aug 2019) The Planetary Society (Andrew Jones)
Longjiang-1 contact lost after trans-lunar injection; Longjiang-2 in lunar orbit from 25 May 2018 to its planned impact.
-
Last message from the 4M probe on 11 November 2014; the operator says it fulfilled all its goals.
- Trajectory Design and Early Mission Operations for the Lunar IceCube Mission (AAS 23-305) R. E. Pritchett, D. C. Folta, S. Hur-Diaz, K. Hughes (NASA Goddard)
No communication link with Lunar IceCube was ever established; the mission could not be completed.
-
OMOTENASHI could not perform its landing manoeuvre: the Moon landing objective was not achieved.
-
End of OMOTENASHI operations: no signal received, probe beyond communication range.
-
EQUULEUS completed its lunar flyby as planned, on its way to the Earth-Moon L2 point.
-
ICUBE-Q entered lunar orbit on 8 May 2024; its first images were handed over at a CNSA ceremony on 10 May.
- ShadowCam PDS Release – September 2026 (21 Aug 2026) ShadowCam team, Arizona State University
Danuri in lunar orbit since the end of December 2022; ShadowCam observations released through September 2025.
- Chang'e-4 and Yutu-2: China's mission to the Moon's farside (updated 13 Jul 2026) The Planetary Society
Chang’e-4 still conducts science; Yutu-2 has not appeared to move since March 2024.
- Chang’e-7: China’s water-hunting lunar south pole mission (updated 20 Aug 2026) The Planetary Society
Queqiao-2, already in lunar orbit, is to relay for Chang’e-7.
-
ESA’s lunar small missions (pilots between 2028 and 2030): VMMO on the direct track, Máni among the studied missions.
-
VMMO’s goals, consortium (MPBC prime), polar frozen orbit and potential launch in Q4 2028 on a CLPS flight.
- Denmark’s first mission to the Moon gets ESA greenlight (2 Jan 2026) European Spaceflight
ESA selected Máni on 16 December 2025 for the next phase; launch expected in 2029.
- Máni mission University of Copenhagen
Máni’s goal (high-resolution maps of the Moon’s surface and composition), polar orbit and readiness for launch at the end of 2028.
- Deep Space Chronicle: A Chronology of Deep Space and Planetary Probes, 1958–2000 (NASA SP-2002-4524) Asif A. Siddiqi, NASA History Office
The outcome code (successful, partial, unsuccessful) of each early Moon mission in its Master Table, compared with the 2018 edition.
- Lunar Impact: A History of Project Ranger (NASA SP-4210, 1977) R. Cargill Hall, NASA
How each Ranger flight went: the results table and the performance of launch vehicle, spacecraft and experiment.
- Ranger 4 mission page NASA Jet Propulsion Laboratory
Ranger 4’s computer failure, which left it unable to carry out its science objectives.
- Ranger 5 mission page NASA Jet Propulsion Laboratory
Ranger 5’s batteries drained after about eight hours; it missed the Moon by 725 km.
- 50 Years Ago: On the Way to the Moon (2018) NASA History
Zond 6: cabin depressurization, loss of the biological payload, crash on landing, and the Soviet claim of a successful flight.
- Why ISAS does EQUULEUS (ISAS document 24, Oct 2023, in Japanese) Shintaro Nakajima, JAXA / ISAS
EQUULEUS reached the full success of its criteria in May 2023; no signal since the 18 May 2023 pass, search continuing.
- Challenges and Operations to Re-Establish Communications With EQUULEUS After Loss of Contact (SmallSat 2024) Kawabata, Nakajima, Fuse, Nomura, Matsushita, Akiyama, Miyoshi, Funase
EQUULEUS achieved full mission success, then contact was lost on 18 May 2023; the operations to re-establish it.
- Development and Prospect of Chinese Lunar Relay Communication Satellite (2021) L. Zhang, Space: Science & Technology
Queqiao worked well and relayed Chang’e-4 through its mission, from its halo orbit around Earth-Moon L2.
- China launches new relay satellite for Earth-Moon communications (20 Mar 2024) China National Space Administration
Queqiao has exceeded its design life; Queqiao-2 takes over the relay for Chang’e-4.
- Danuri Mission Extended by Two More Years Until 2027 (11 Feb 2025) Korea AeroSpace Administration
Danuri completed its planned one-year lunar mission; operations extended through 2027, impact planned in March 2028.
- Setting Our Sights on the Moon with Shoebox-Sized Satellites Lockheed Martin
The operator says LunIR was ultimately unable to complete its mission in space.
- LunIR (Lunar InfraRed imaging) eoPortal (ESA)
No infrared image of the lunar surface; reports the operator calling LunIR a successful technology demonstration.
- Pakistan’s Lunar CubeSat ICUBE-Q successfully deployed in orbit on May 08 (May 2024) Associated Press of Pakistan
ICUBE-Q in lunar orbit, performing as designed (May 2024).
-
90 to 95% of Chandrayaan-2’s objectives accomplished, the orbiter working, communication with the lander lost.
Software and type
- three.js three.js authors
WebGL rendering of the Moon.
- SvelteKit Svelte contributors
The site itself.
- Gloock · Inter Tight · IBM Plex Mono The Gloock Project Authors · The Inter Project Authors · IBM Corp.
Titles, text and figures.
Maintainers
They review every suggestion, and answer for what is published.
- Rémy Baroukh Founder · remybaroukh.fr
The code
All of Khonsu — code, data pipeline, tests — is open.
The repositoryCode AGPL-3.0 · texts CC BY 4.0 · data: the licence of their source